Enbridge Husky L45 Connection

Enbridge Husky L45 Connection Scope of Work 2,000 m3 – Brownfield excavation and backfill for buried lines 2,350 WIN – Fabrication of NPS 36 spools for field installation 2,200 WIN – Installation of NPS 36 spools Fabrication and installation of...

Enbridge Gibson Heavy Construction

Enbridge Gibson Heavy Construction Scope of Work 4,000 m3 – Brownfield excavation and backfill for buried lines 4,400 WIN – Shop fabrication of NPS 36” and 42” spools 3,500 WIN – Field installation of NPS 36” and 42” spools Pipe insulation and...

North East Anthony Henday Drive

North East Anthony Henday Drive Scope of Work 7.69M m3 – Excavation 831,000 m2 – Subgrade Prep for mainline highway and cross roads 5.5 km – CSP 5.0 km – Storm Pipe   Project Statistics: Location:Edmonton, AB Duration:Aug 2012 – Oct...

Meridian Street Creek Crossing

Meridian Street Creek Crossing Scope of Work 170,000 m3 – Earthworks 500 m – Storm Pipe (375mm to 1,500mm dia. @ 4m to 10m deep) 50 vm – Manholes (1,200mm to 3,000mm dia.) 10 ea – Catch Basins 20,000 m2 – Road Grade Preparation 131 m...