Enbridge Husky L45 Connection

Enbridge Husky L45 Connection Scope of Work 2,000 m3 – Brownfield excavation and backfill for buried lines 2,350 WIN – Fabrication of NPS 36 spools for field installation 2,200 WIN – Installation of NPS 36 spools Fabrication and installation of...

Enbridge Gibson Heavy Construction

Enbridge Gibson Heavy Construction Scope of Work 4,000 m3 – Brownfield excavation and backfill for buried lines 4,400 WIN – Shop fabrication of NPS 36” and 42” spools 3,500 WIN – Field installation of NPS 36” and 42” spools Pipe insulation and...

Shop Fabrication Services

Shop Fabrication Services Scope of Work Provide full service shop fabrication including but not limited to: constructability reviews, budget estimates, material supply, shop drawings, hydrotesting, structural steel, painting and coating, trucking, storage, etc.  ...

Hidden Lake North Compressor Station

Hidden Lake North Compressor Station Scope of Work NPS 2 – NPS 42 Yard and facility piping 700 rig mats utilized full-time during construction 61,000 m3 of fill added to allow site water control system functionality Full ASME Quality Audit performed onsite –...

Kearl Lake Pump Station Addition

Kearl Lake Pump Station Addition Scope of Work Upgrades to existing two 5750 HP pump units Addition of one (1) 5750 HP mainline pump unit series with existing pumps Addition of VFD building Manage and supply all site Electrical and Instrumentation contractors...