Parsons Creek Interchange

Parsons Creek Interchange Scope of Work 5,000,000 m3 – Excavation 1,000,000 m – Wick Drains 450,000 tonne – Road Gravel 190,000 tonne – Asphalt (produced in onsite plant) 3.67 m dia – Structural Steel Plate Culvert for Stream Diversion...

North East Anthony Henday Drive

North East Anthony Henday Drive Scope of Work 7.69M m3 – Excavation 831,000 m2 – Subgrade Prep for mainline highway and cross roads 5.5 km – CSP 5.0 km – Storm Pipe   Project Statistics: Location:Edmonton, AB Duration:Aug 2012 – Oct...

Meridian Street Creek Crossing

Meridian Street Creek Crossing Scope of Work 170,000 m3 – Earthworks 500 m – Storm Pipe (375mm to 1,500mm dia. @ 4m to 10m deep) 50 vm – Manholes (1,200mm to 3,000mm dia.) 10 ea – Catch Basins 20,000 m2 – Road Grade Preparation 131 m...

Malcolm Tweddle & Edith Rogers Dry Ponds

Malcolm Tweddle & Edith Rogers Dry Ponds Scope of Work 211,500 m3 – Earthworks For Pond Excavation 287 lm – 1200mm—3000mm Large Diameter Concrete Storm Pipe 1 ls – Demolition of Existing Building (incl. Asbestos Abatement) 1 ls –...