Scope of Work

  • 2,200 lm – Storm Pipe (300mm – 1200mm)
  • 2,500 lm – Sanitary Pipe (200mm – 300mm)
  • 3,000 lm – Water Pipe (150mm – 450mm)
  • 130 lm – Case Boring
  • 1 ls – Control Structure w/ Fontaine Sluice Gate
  • 204 each – Lot Services

 

Project Statistics:

  • Location:Edmonton, AB
  • Duration:August – December 2015
  • Owner:Qualico
  • Our Services:
    • Underground Utilities

Project Description:

 Underground utility installation of an urban subdivision. Installation of 2,200 meters of storm pipe ranging in size from 300mm to 1200mm. Installation of 2,500 meters of sanitary pipe ranging in size from 200mm to 300mm. Installation of 3,000 meters of water pipe ranging in size from 150mm to 450mm. Installation of one Control Manhole with Fontaine Sluice Gate. Installation of 204 lot services. 130m Auger Shot and Dust Control Management.