Scope of Work
- Upgrades to existing two 5750 HP pump units
- Addition of one (1) 5750 HP mainline pump unit series with existing pumps
- Addition of VFD building
- Manage and supply all site Electrical and Instrumentation contractors
- Expansion of existing pump shelter
- Upgrades to outdoor switchgear with VCB, ultrasonic flow meter and static mixer; cathodic protection upgrade
- Add new connections to existing sump and remove and replace existing surge tank and complete CTIB modification
- Included all site earthworks, concrete, paint and insulation
Project Statistics:
- Location:Kearl Lake Plant site, Northern AB
- Duration:2014-2015
- Owner:Enbridge
- Our Services:
- Mechanical
Project Description:
Sureway Industrial Services Ltd. was contracted by Enbridge for the expansion of the existing Woodlands Pump Station; addition of a new pump and sump tank.