Scope of Work
- NPS 2 – NPS 42 Yard and facility piping
- 700 rig mats utilized full-time during construction
- 61,000 m3 of fill added to allow site water control system functionality
- Full ASME Quality Audit performed onsite – received highest mark given on 200,000 sites by USA Audit Team
- Full NEB Audit performed during shop fabrication – received full pass by Government Audit Team.
- Peak manpower of approximately 200 personnel
Project Statistics:
- Location:180Km NW of Manning, AB
- Duration:2014-2015
- Owner:TC Energy
- Our Services:
- Mechanical
Project Description:
As the Prime Contractor, Sureway Industrial Services Ltd. was contracted by Trans Canada for the Greenfield installation of a 15 megawatt natural gas compressor station, from piling stage through to commissioning and final grading/fencing.