Hidden Lake North Compressor Station

Scope of Work

  • NPS 2 – NPS 42 Yard and facility piping
  • 700 rig mats utilized full-time during construction
  • 61,000 m3 of fill added to allow site water control system functionality
  • Full ASME Quality Audit performed onsite – received highest mark given on 200,000 sites by USA Audit Team
  • Full NEB Audit performed during shop fabrication – received full pass by Government Audit Team.
  • Peak manpower of approximately 200 personnel

 

Project Statistics:

  • Location:180Km NW of Manning, AB
  • Duration:2014-2015
  • Owner:TC Energy
  • Our Services:
    • Mechanical

Project Description:

As the Prime Contractor, Sureway Industrial Services Ltd. was contracted by Trans Canada for the Greenfield installation of a 15 megawatt natural gas compressor station, from piling stage through to commissioning and final grading/fencing.