Enbridge South Edmonton Terminal

Scope of Work

  • 32 Hectares – Clearing and stripping of land (40% Wetlands)
  • 700,000 m3 – Bulk Earthworks
  • 5 tanks – 550,000 bbl tank pad foundations
  • 750,000 t Gravel – (400,000 t placed in winter)
  • 4,700 lm – Excavation and backfill of product pipe
  • 3,500 lm – Excavation and backfill of electrical installation
  • 3,000 lm – HDPE firewater installation (up to 600 mm Dia.)
  • 2,600 lm – CSP/PVC drainage pipe
  • 700 lm – PVC sub-drain system
  • 1,200 m3 – Concrete structures
  • 10 – Lift stations with pumps and force mains

 

Project Statistics:

  • Location:Edmonton, AB
  • Duration:September 2013 – May 2016
  • Owner:Enbridge
  • Our Services:
    • Earthworks
    • Underground Utilities
    • Mechanical

Project Description:

Sureway was contracted by Enbridge for all earthworks, and underground utility installation for a new tank terminal expansion adding five 550,000 bbl tanks at the South Edmonton Terminal.