Scope of Work
- 32 Hectares – Clearing and stripping of land (40% Wetlands)
- 700,000 m3 – Bulk Earthworks
- 5 tanks – 550,000 bbl tank pad foundations
- 750,000 t Gravel – (400,000 t placed in winter)
- 4,700 lm – Excavation and backfill of product pipe
- 3,500 lm – Excavation and backfill of electrical installation
- 3,000 lm – HDPE firewater installation (up to 600 mm Dia.)
- 2,600 lm – CSP/PVC drainage pipe
- 700 lm – PVC sub-drain system
- 1,200 m3 – Concrete structures
- 10 – Lift stations with pumps and force mains
Project Statistics:
- Location:Edmonton, AB
- Duration:September 2013 – May 2016
- Owner:Enbridge
- Our Services:
- Earthworks
- Underground Utilities
- Mechanical
Project Description:
Sureway was contracted by Enbridge for all earthworks, and underground utility installation for a new tank terminal expansion adding five 550,000 bbl tanks at the South Edmonton Terminal.