Enbridge L3r Early Works

Scope of Work

  • 1,000 m3 – HDPE firewater installation
  • 14 Ha – Clearing, stripping and grading
  • 3.7 Ha – Lining containment
  • Building demolition, building grading, structural fabrication for tank lot access
  • Construction of 3 tank foundations
  • Final grading and gravel for tank lot, laydown and access roads
  • Installation and coating for tank piping including riser fabrication for 3 tanks
  • Tank lot electrical installation
  • Tank lot piling

 

Project Statistics:

  • Location: Hardisty, AB
  • Duration:August 2017 – May 2018
  • Owner:Enbridge
  • Our Services:
    • Earthworks
    • Underground Utilities
    • Mechanical

Project Description:

 Sureway was contracted by Enbridge for tank lot construction, including all mechanical, electrical and civil construction to the containment limits.