Scope of Work
- 1,000 m3 – HDPE firewater installation
- 14 Ha – Clearing, stripping and grading
- 3.7 Ha – Lining containment
- Building demolition, building grading, structural fabrication for tank lot access
- Construction of 3 tank foundations
- Final grading and gravel for tank lot, laydown and access roads
- Installation and coating for tank piping including riser fabrication for 3 tanks
- Tank lot electrical installation
- Tank lot piling
Project Statistics:
- Location: Hardisty, AB
- Duration:August 2017 – May 2018
- Owner:Enbridge
- Our Services:
- Earthworks
- Underground Utilities
- Mechanical
Project Description:
Sureway was contracted by Enbridge for tank lot construction, including all mechanical, electrical and civil construction to the containment limits.