Scope of Work
- 2,000 m3 – Brownfield excavation and backfill for buried lines
- 2,350 WIN – Fabrication of NPS 36 spools for field installation
- 2,200 WIN – Installation of NPS 36 spools
- Fabrication and installation of structural steel for pipe rack and manifold additions
- Electrical installations for instrumentation, controls, and lighting
- Commissioning support
- Manifold containment
- Piling
Project Statistics:
- Location:Hardisty, AB
- Duration:Aug 2018 – Dec 2018
- Owner:Enbridge
- Our Services:
- Mechanical
- Underground Utilities
Project Description:
Sureway was contracted by Enbridge for the construction of 36” connection piping, including all mechanical, electrical, structural, and civil installations.