Scope of Work
- 70,000 m2 Road Pregrade
- 5,200 lm Sanitary Pipe w/ Auger (250mm – 375mm)
- 4,900 lm Waterline w/ Auger (300mm – 400mm)
- 4550 lm Storm Pipe w/ Auger (675mm – 1050mm)
- 300 lm 200mm DR35 & 100mm DR18 PVC Forcemain
- 1 ls Multi-Level Outfall System
Project Statistics:
- Location:Nisku, AB
- Duration:June 2017 – December 2018
- Owner:Remington Development
- Our Services:
- Earthworks
- Underground Utilities
Project Description:
Earthworks and drainage for Remington Development Corporation – Discovery Park. (Projects within Discovery Tender: Offsite Storm, Grading, UG installation, Multi-Tenant Building Site). Whitemud Creek – multi-level outfall system installation c/w gabion baskets, class 1 riprap and erosion matting. 2.5 km of ditch widening / landscaping. 2600m of lot Services, 750m CSP Culvert and 2,000m3 of dirt excavation.