Crystallina Stage 8B & 13

Scope of Work

  • 31,200 m3 – Topsoil Stripping
  • 310,000 m3 – Common Cut/Fill for Site Balance & Pond
  • 2,074 lm – Storm Sewer (Onsite, Offsite, Trunks, SWMF)
  • 1,560 lm – Sanitary Sewer (Onsite, Offsite, Trunks)
  • 2,060 lm – Watermain (Onsite, Offsite, 150mm to 450mm dia.)
  • 6,354 m2 – Road Pregrade & Asphalt Surfacing
  • Sidewalks, Curbs & Gutters
  • Shallow Utilitiies – Power, Gas, Communication

 

Project Statistics:

  • Location:Edmonton, AB
  • Duration:May 2018 – June 2020
  • Owner:Genstar Developments
  • Our Services:
    • Earthworks
    • Underground Utilities

Project Description:

Sureway acted as General Contractor on the 117 lot residential development for Crystallina Stage 8B & 13. Scope included Underground Deep Utility Installation (Storm, Sanitary, Water), Grading/Earthworks, Surface (Roadways) and Shallow Utility Installation. Sureway obtained all Construction Completion Certificates (CCC) for all scopes under our General Contract.