Scope of Work
- Planned maintenance on 30+ existing battery sites
- Removal and replacement of: a 100 ft. vessel, all flare stack guy wires, knock-out drums, cooling tower, various tube bundles, flare igniter and 10 ft. of flare stack, river intake and 10,000 diameter inches of process piping
Project Statistics:
- Location:Mitsue Lake, AB
- Duration:2015
- Owner:Canetic Resources
- Our Services:
- Mechanical
Project Description:
Sureway Industrial Services Ltd was contracted as the General Contractor by Canetic Resources to perform a full maintenance shutdown on the Mitsue Sour Gas Plant and associated battery sites. During preparation for the planned plant work, prior to shutdown, numerous previously unknown mechanical and technical issues were discovered, resulting in a request from the Client to perform a full upgrade to the plant.